With the building’s foundations so near to tunnelling works, movement of just 1.5mm could risk damage to the façade, requiring precise monitoring and control throughout construction.
Emergency motorway solution following bridge strike
Bank Station, London
Project Overview
| Location |
|
|---|---|
| Sector | Rail |
| Products |
Tunnelling in London presents many complex engineering challenges. With a maze of existing tunnels, sewers, utilities and building foundations to navigate, care and consideration needs to be given to every hole drilled.
When such a degree of accuracy is required, real-time monitoring allows any issues to be responded to quickly, safely and efficiently, enabling work to go ahead as planned, without affecting the integrity of surrounding structures.
Our solution
Dragados engaged us to develop a mitigation system which would allow works to be carried out safely, adjacent to the building.
Accurate real-time monitoring of the height and position of the existing building columns of 33 King William Street ensured that any movement resulting from the tunnelling work never exceeded set parameters.
View our Structural Monitoring Range
Any movement of the building from activity below ground was measured using tilt-sensors. In the event of any small vertical movements a series of hydraulic screwed ram jacks would return the columns to their original position, while horizontal movement was managed by electric screwed ram jacks. Both teams were notified immediately if any movement did occur.
Get in touchProject images
Related news and projects
- Project
- Fort Gilkicker, Hampshire
Monitoring protects 19th century grade II listed fort from modern-day action
- Project
- Merstham Viaduct, Surrey
Monitoring technology helps keep busy M25 junction open
- Project
- UK Paper Mill
Innovative monitoring application provides early warning system in remedial works
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
When tunnelling in such complex locations as Central London, there is no room for error. It was vital that our construction and engineering teams had access to a complete real-time view of the state of surrounding structures, as well as the project itself, and any environmental impact.
Mabey Hire’s monitoring solution enabled the works to go ahead safely and efficiently as planned and provided assurance that the integrity of surrounding structures would not be compromised.