Installed as part of Siemens BAM JV’s power line upgrade works, the temporary bridge was vital in keeping the new substation project on programme and on budget.
Essential bridge access in substation development
River Spey, Inverness
Project Overview
| Location |
|
|---|---|
| Sector | Power & Energy |
| Products |
Siemens BAM JV carried out a power line upgrade at the SSE Melgarve substation near Inverness. A temporary bridge was needed that could cope with 197 tonne vehicles and provide an alternate public traffic access route. The existing bridge was not suitable to carry that load.
The temporary bridge was critical to help keep the construction of the new substation (part of the Stronelairg wind farm connection project) on time and on budget.
Our solution
We worked closely with Siemens BAM to create the design, survey the location, schedule the delivery and install on-site.
Our Mabey Universal Vehicle Bridge was selected as perfect for the project, which is our most heavy-duty modular panel bridge.
Learn more about Mabey Universal Bridge
This allowed the client to carry exceptionally heavy loads and provided additional public traffic access for the wider community.
To add to the challenge, tough winter conditions kicked in to make it a more difficult job, for our site installation teams. They are used to working in all conditions, so still managed to install the bridge in just 22 working days – ahead of plan.
Get in touchProject images
Related news and projects
- Project
- Killin, Scotland
Temporary bridge protects Scotland’s rural landscape during major Project VISTA works
- Project
- New Elvet Bridge, Durham
Unique lifting technique helps get crucial city centre transport job underway
- Project
- Darley Abbey, Derby
Complex bridge lift helps reconnect local Derby community
- Project
- River Tame, West Midlands
Constructing one of Europe’s largest double storey bridges for HS2
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
“A heavy duty access solution to the project, in an area of high environmental value, was required urgently. Mabey Hire’s response was excellent, rising to the challenge – they worked with us as a team through difficult Scottish weather, and we managed to successfully complete the project ahead of schedule.”