After the pier replacement, our team de-jacked and dismantled the system, ensuring the road beneath the M62 reopened on schedule ahead of Christmas.
Creative solution helps replacement works on busy motorway bridge
Ferrybridge, West Yorkshire
Project Overview
| Location |
|
|---|---|
| Sector | Highways |
| Products |
When Highways England engineers identified the need to replace part of the supporting concrete structure on a busy motorway bridge, our engineers worked closely with the customer to come up with a creative solution to some unusual challenges so that repair work could go ahead.
Construction company Interserve were awarded the contract to replace one of the piers supporting the M62 bridge over the A162 in Ferrybridge, West Yorkshire.
Our solution
We supplied 52 tonnes of our strongest propping system, Superprop, to prop the bridge on either side of the pier.
Our hydraulics team and site crew transferred the load to the props using 44 Hymat jacks during night closures of the M62.
Learn more about our propping
The pier was replaced over the following weeks and, in order to make sure the road below the M62 was open on schedule in time for Christmas, the same teams stayed on site to de-jack and dismantle the system.
Project images
Related news and projects
- Project
- Kennington Bridge, Oxfordshire
Propping and monitoring ensures safety of key transport link
- Project
- Allerdene Bridge, Gateshead
Building bridges during major A1 upgrade, with our propping expertise
- Project
- Whorlton Bridge, County Durham
183 year old bridge revived with modern engineering
- Project
- Deep Pit Bridge, Wigan
Bridge lift helps facilitate railelectrification
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
“From working through a near unsolvable engineering problem with our Technical Services team, to de-mobbing the site in record time and giving us the programme confidence to complete the site before the Christmas break, Mabey Hire contributed all they could to the success of the project.”