Appointed by Amey PLC, we designed and installed a comprehensive propping and structural monitoring solution to ensure safety and stability throughout the works.
Propping and monitoring flyover during remedial works
Hammersmith Flyover, London
Project Overview
| Location |
|
|---|---|
| Sector | Highways |
| Products |
Completed in 1961, the Hammersmith flyover in west London carries the A4 arterial road over and to one side of the central Hammersmith gyratory system.
It’s one of the first examples of an elevated road using reinforced concrete.
Our solution
We installed Superprop, our strongest propping system, with integrated hydraulics used to maintain the loads of the structure. Our monitoring solution made sure that no undue stresses were applied to the structure.
The readings from the hydraulic cylinders were fed back to the load monitoring system, which alerted the engineering teams if the loads exceeded the strict parameters.
Learn more about propping & jacking
In addition to the pressure monitoring, temperature sensors were also positioned onto the props to compensate for any changes to the data caused by thermal factors.
The data collected on site was presented to engineers in real-time, allowing prompt action should loads change unexpectedly.
Get in touchProject images
Related news and projects
- Project
- M6, Lancashire
Emergency motorway solution following bridge strike
- Project
- Allerdene Bridge, Gateshead
Building bridges during major A1 upgrade, with our propping expertise
- Project
- Ferrybridge, West Yorkshire
Creative solution helps replacement works on busy motorway bridge
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk