During the design of a new permanent bridge, an immediate temporary solution was required to restore access and reconnect the community.
Reconnecting a village after flooding washes away bridge
Pooley Bridge, Cumbria
Project Overview
| Location |
|
|---|---|
| Sector | |
| Products |
Unprecedented levels of rainfall caused extensive flooding in the Pooley Bridge area, leading to the collapse of the 18th century bridge.
Our solution
We worked with Story Contracting to install our largest bridging solution – Mabey Universal Vehicle Bridge – to accommodate pedestrians and two lanes of traffic.
We returned in 2019 to remove the temporary road bridge when the construction of the permanent structure began. Our temporary Pedestrian BeamBridge was then installed to allow pedestrian access while the works were carried out.
Learn more about our bridges
Project images
Related news and projects
- Project
- Deep Pit Bridge, Wigan
Bridge lift helps facilitate railelectrification
- Project
- Barmouth, Wales
150-year-old bridge brought back to life with innovative bridge lift
- Project
- Whorlton Bridge, County Durham
183 year old bridge revived with modern engineering
- Project
- Allerdene Bridge, Gateshead
Building bridges during major A1 upgrade, with our propping expertise
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk